Wastewater Distribution Projects
Most projects include design, procurement services, construction administration, and easement preparations.

  • City of Wickliffe, KY
    The relocation and replacement of the City’s Main Lift Station.  The new lift station is designed for as a triplex chopper pump station.  This project includes the redirection of approximately 1,000 LF of gravity lines and a new 8” force main.  In conjunction with the lift station upgrades, 15 manholes and 1,500 LF of sewer is to be epoxy lines / cured-in-place.
  • The City of Wickliffe, KY
    The renovation of the City’s River Lift Station with two new chopper pumps and a new 2,000 LF forcemain.
  • Joint Sewer Agency, Paducah, KY
    The Project consisted of composite mapping for the proposed Western Regional Interceptor system:  CDG worked with the executive director in pulling information from the 201 facility plan, GIS information, and aerial imaging to develop a composite map.  The interceptor system, with an estimated construction cost of 19 million dollars, is the core facilities that will both alleviate the existing Perkins Creek Interceptor and provide for future expansion in the western portions of the county.
  • Joint Sewer Agency, Paducah, KY
    The project consisted of the design for a gravity and force main relocation due to a highway expansion
  • Joint Sewer Agency, Paducah, KY
    The project consists of the design for approximately 1,600 LF of 12”, 2,500 LF of 10”, and 3,800 LF of 8” PVC gravity sewer lines.  It also included 6,000 LF of 6” PVC force main.  This project was constructed along US 60 in West Paducah.
  • Joint Sewer Agency, Paducah, KY
    The focus of this study was to develop a system wide fee schedule.  The study area encompassed a development that exhibited high density urban installation of sewer facilities, lower density rural installations, as well as the development of commercial facilities.  With the application of per acre densities of commercial and residential uses, the construction cost per equivalent residential unit was utilized by the agency as the basis for the system wide development (tap)
  • Joint Sewer Agency, Paducah, KY
    The project consists of the replacement and relocation of the Woodview Pump Station along with piping and appurtenances.