Water Distribution Projects
Most projects include design, procurement services, construction administration, and easement preparations.
- West McCracken Water District, Paducah, KY
The project consisted of the design of approximately 3,000 LF of 8” PVC and 7,000 LF of 6” PVC water main along US 60 from Rice Springs Road to Bethel Church Road and continuing down Bethel Church Road to the intersect with Woodville Road.
- The City of Wickliffe, KY
The project consisted of the design of approximately 7,900 LF of 8” PVC water main along Buck Lane and HWY 1290.
- Symsonia Water and Wastewater District, Symsonia, KY
The project consisted of the design of approximately 8,700 LF of 6” PVC water main along HWY 348, including a master meter and vault.
- West McCracken Water District, Paducah, KY
The project consisted of the design of approximately 10,500 LF of 6” PVC water main and a 125,000 gallon elevated water storage tank.
- The Symsonia Water and Sewer District, Symsonia, KY
The project consists of the design for Dual Vertical Pressure Iron Filters and related appurtenances for the District’s 0.5 MGD treatment plant.
- West McCracken Water District, Paducah, KY
The project consisted of the design for multiple water line extensions. It was broken down to three separate construction contracts. Contract “A” included Magruder Road, Woodville Road and Mayfield-Metropolis Road, 12,063 LF 10” PVC. and 4,085 LF 6” PVC. Contract “B” included West Airport Road, Childress and Gholson Roads, 36,870 LF 6” PVC and Contract “C” included Biggs Road and Bob Harris Road, 10,270 LF 6” PVC
- The City of Wickliffe, KY
300,000 Gallon elevated storage tank, New high service pumps and Plant Telemetry.,
Water line extenstion.
Projects Designed by CDG:
|